We convert vehicles to run on compressed natural gas (CNG) bi-fuel systems.
Enjoy significant cost savings of at least 50% in fuel costs after converting your vehicle to CNG bi-fuel with us. Our team is lead by qualified engineers affiliated with the Engineers Registration Board in Tanzania and the Dar es Salaam Institute of Technology.
We believe that CNG is the fuel of the future and we are committed to expanding this technology in Tanzania.
Minimum of 50% on fuel costs, can even go up to 75% on long distance trips!
Yes, our installations are leak tested after completion and inspected by Tanzania Bureau of Standards (TBS) inspector. CNG ignites at high temperature of 540 degrees C while petrol‘s flash point temperature is -23C.
No, your car will automatically switch to using petrol fuel.
Ubungo and Tazara. We plan on introducing Kleenair CNG filling stations soon so stay tuned.
Yes they can be done but we are currently only converting petrol vehicles.
It would be advised to purchase a gas powered generator and ensure constant gas supply. We can not convert generators.
Kleenair CNG is the sole local partner for Nirmal Industrial Controls PvT Limited, a world-renowned designer and manufacturer of Pressure Reduction and Metering Skids (PRMS). Currently, Nirmal skids have been successfully installed and are operational at:
1) TANESCO Kinyerezi 1 150MW Power Plant
2) TANESCO Kinyerezi 1 Extension 185MW
Power plant
3) GASCO PRMS unit in Ubungo
Kleenair CNG is the sole local partner for Nirmal Industrial Controls PvT Limited, a world-renowned designer and manufacturer of Pressure Reduction and Metering Skids (PRMS). Currently, Nirmal skids have been successfully installed and are operational at:
1) TANESCO Kinyerezi 1 150MW Power Plant
2) TANESCO Kinyerezi 1 Extension 185MW
Power plant
3) GASCO PRMS unit in Ubungo
Kleenair CNG offers project management and consulting services for power projects, drawing from our extensive experience in managing EPC power plant projects.
We have been heavily involved in the Kinyerezi 1 150MW & Kinyerezi 1 Extension 185MW Powerplant projects, and our team has the expertise to manage complex projects to ensure they are delivered on time, within budget, and to the highest quality standards.
At Kleenair CNG Limited, we are committed to delivering quality services and products that are reliable, sustainable, and environmentally friendly. We pride ourselves on our professionalism, attention to detail, and commitment to safety. Our goal is to provide our clients with a cost-effective, sustainable, and safe solution for their transportation and energy needs.
Kleenair CNG Limited
Email: info@kleenaircng.co.tz
Tel: +255 765 33 33 99
P. O. Box 4321 Plot 266
Block A Mjimwema – Kigamboni
Dar es Salaam
Tanzania
© Kleenair CNG 2023 | Powered by Chapa Link